Tracks are in the Ground for New Atlanta Streetcar Line

IMG_4543_s640x428

ATLANTA — Crews continue to install tracks for a new streetcar line that is set to start operating next spring.

When it opens, the 2.7-mile streetcar line will connect with MARTA, the city’s transit system. Future plans call for the new streetcar to tie into the Atlanta BeltLine, a public-private partnership that is building walking paths along a ring of mostly abandoned railroad right-of-ways that circle the city.

Workers are expected to install a block of track every three to four weeks. The new line is funded with nearly $100 million – or roughly $37 million per mile – in federal and local funding.

“Actually seeing tracks being laid and sidewalks being rebuilt is thrilling and a major step for the city of Atlanta,” Tom Weyandt, senior policy adviser of transportation with the mayor’s office recently told Construction Equipment Guide. “The major federal funding was announced in October 2010, and since then we have been engaged in the final design, contractor selection, real estate and utilities prep work. Now that guideway construction is underway, one can actually get the vision for the final product.”

Click here to read more.

Railfanning Review Podcast

Before you copy and paste this information to your website, please keep in mind this research took a lot of effort. Appreciate it. Learn from it. But do not plagiarize it. Yes, if you think we might be talking to you, we are.

Avatar photo
About Todd DeFeo 449 Articles
Todd DeFeo loves to travel anywhere, anytime, taking pictures and notes. An award-winning reporter, Todd revels in the experience and the fact that every place has a story to tell. He is owner of The DeFeo Groupe and also edits Express Telegraph and The Travel Trolley.